We have our preliminary plans and prestart is on Friday!!! Finally we're starting to get somewhere.
Keep your eyes peeled over the next few days as there will be new posts about tiles/colours/etc. once I get myself a bit more organised.
Showing posts with label floorplans. Show all posts
Showing posts with label floorplans. Show all posts
Sunday, 27 February 2011
Sunday, 6 February 2011
Waiting, waiting, waiting ...
As you can see in the last post, we have made quite a few changes to the original floorplan, which is apparently what is holding up the whole process.
We gave our 'final draft' of the plans to our incredibly patient customer liaison officer (CLO) Sharee back at the beginning of October. She told us it would take 8 weeks to get the preliminary plans done and sent out to us with all the costings but here we are in February still waiting.
I know we made lots of changes but seeing as we received a copy of the plans with the changes on them within a week, I'm a bit confused as to why it's taking so long now.
Oh well, all we can do is wait ... and wait some more.
I'll be the thumb-twiddling champion of the world if this keeps up ...
We gave our 'final draft' of the plans to our incredibly patient customer liaison officer (CLO) Sharee back at the beginning of October. She told us it would take 8 weeks to get the preliminary plans done and sent out to us with all the costings but here we are in February still waiting.
I know we made lots of changes but seeing as we received a copy of the plans with the changes on them within a week, I'm a bit confused as to why it's taking so long now.
Oh well, all we can do is wait ... and wait some more.
I'll be the thumb-twiddling champion of the world if this keeps up ...
Saturday, 29 January 2011
House plans
We went out to have a look at the house on display in Byford and had a chat to the lovely sales consultant, Sharee. After looking at my rather mangled version of the floor plan, she gave me a few scale copies to play with. This is the original:

and this is ourslightly majorly revised version:

It's still recognisable as the Floreat, but only just! We have made many, many changes some of which are:

and this is our

It's still recognisable as the Floreat, but only just! We have made many, many changes some of which are:
- added extra space on to the garage for Peter to use as a shed/workshop (also reduced the size of the entry hall for the same reason),
- completely redesigned the kitchen (still making changes)
- moved the bathroom, laundry and toilet so that the toilet wasn't off the laundry and all the wet area doors were adjacent,
- enclosed the activity to make an extra bedroom so all three boys' rooms were in the same end of the house (which makes Bedroom 2 a
guestcraft room all for me!) - moved a lot of doorways to more practical places (eg. entry to minor bedrooms hallway, games room entrance, home theatre entrance)
- moved wall in dining room to create a linen cupboard
- changed all robes in minor bedrooms to double width built-in-robes with sliding doors instead of walk-in-robes
- sacrificed part of my WIR to create a 'jacket and helmet' cupboard (store in entry)
- redesigned ensuite (still making changes to this too!)
- lengthened the alfresco area
- enclosed and slightly lengthened the home theatre and
- added doors to everywhere I could!
I'm sure there's more but I can't think of them right now and I really can't be bothered getting up to go find the list of changes .. maybe another day! Please let me know what you think and anything you would change.